The Process
In order to thoroughly monitor the daily water quantity, we crafted a rain gauge that we then placed in the open. Further on, every morning and evening we would inspect the acquired water quantity and thus performed relevant data gathering.
What is more, we analyzed the data and then correlated it with the temperature range of the respective dates, as well as with the daily level of the Dambovita river.
A further implication of our project is to compare the rain water with the one from the Dambovita river, as well as with good drinking water. The subject is going to be investigated in our high school’s Physics lab.
Gallery
Before and After Rain -> +1.2 cm in One Day

